|
|
|
|
Dairy Management System (DMS) dairy cold room management system |
|
This project consists in transmitting to an IBM System i all the information on the start up of a PLC-controlled system, along with radio-frequency for production inventory purposes and real-time shipping. |
|
|
|
|
|
|
General automation of flour mill |
| This project consists in control and management of feeding empty cases to six production units, from the reception of the cases up to the fillers. Multiple projects across the whole of the flour mill activities. |
|
| |
|
|
|
|
|
|
Palletizing system |
| Start-up to modify the palletizing system and conversion of PLC-2 to PLC-5 ControlNet. |
|
|
|
|
|
|
Empty cases management system |
| Control and management of feeding empty cases to production units, from the reception of the cases up to the fillers. This project is conducted in a milk processing plant in a sanitary environment. |
|
| |
|
|
|
|
|
|
Internal development – Artificial Vision System |
| This project consists in identification of several hundred products, classifying them by production source with the format characteristics, particularities and colour. |
|
|
|
|
|
|
Bottling line optimization |
| Over a period of 6 years, within several different projects, modification of bottling lines. |
|
| |
|
|
|
|
|
|
Pumping Station and manufacturer |
| Automation of coal residue transport system by blower, interfaced with power house DCS Bailey system. |
|
|
|
|
|
|
Plant in Candiac |
| Optimization of fibreglass insulation production lines. |
|
| |
|
|
|
|
|
|
Automation of a new lost-wax casting shop production line and of a cast aluminium centre. |
| Automation of a new production line controlled via a telemechanical system. Programming of the PLC, the user interface, supervision system, database and of a barcode reader controller. |
|
|
|
|
|
|
Automation of a new bottle-frosting line |
| Automation of a new bottle frosting line controlled by a SIEMENS system. |
|
| |
|
|
|
|
|
|
Grain terminal controls modernisation |
| Replacement of control system, with new PLC's and new user stations. |
|
|
|
|
|
|
Planer line automation |
| Optimizer addition at the end of the planer to improve the quality of wood gradation. Automation of the line from the end of the planer up to the cases where wood is sorted by length and gradation. |
|
| |
|
|
|
|
|
|
Automation of a chainsaw |
| Automation of a chainsaw that feeds a wood cutting plant; automation of the debarker, the slasher and sorting of the bolts towards the mill entrance. |
|
|
|